Send feedback

Coming from the page: Reorder Point Calculator

One moment…

With safety stock3 methodsNo ads

Reorder Point Calculator

Know the stock level at which to reorder, so you don’t run out before the delivery arrives.

units
days

From ordering to receiving.

Safety stock
units
days
units
days
units
units

  • Lead-time demandunits
  • Safety stockunits
  • Reorder pointunits

Everything is worked out on your device; no figure is sent anywhere.

The reorder point formula

1

Lead-time demand

Average daily demand × lead time in days. 20 units × 7 days = 140 units.

2

Safety stock

By service level: Z × standard deviation of daily demand × √lead time. Or: (max daily demand × longest lead time) − (average × usual lead time).

3

Reorder point

Lead-time demand + safety stock, rounded up. When stock reaches it, order.

Z values for common service levels

The service level is the share of order cycles without a stock-out.

Service levelZ
90%1.2816
95%1.6449
97.5%1.96
98%2.0537
99%2.3263
99.9%3.0902
Your privacy: Everything is calculated in your browser on your device; your figures are never sent to a server.

FAQ

What is a reorder point?

The stock level at which you place a new order, so what is left lasts until the delivery arrives, with a buffer for swings.

How do I calculate safety stock?

If you know the standard deviation of daily sales: Z × deviation × √lead time. If not, use “Max − average” from your highest usage and longest lead time.

Where do I get the standard deviation of demand?

From a few weeks of daily sales: in Excel use STDEV.S on the daily sales column.

What if the lead time varies too?

Enter its standard deviation in the optional field and the combined formula is used: Z × √(lead time × demand deviation² + average demand² × lead-time deviation²).